Aria 8.0 Betriebsanweisung Seite 196

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 344
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 195
196 BD FACSAria II User’s Guide
2 Click Start to start the backflush.
3 Click Stop to stop the backflush, or click Cancel to stop the backflush and
close the dialog.
The backflush does not stop automatically.
Prime After Tank Refill
Use the Prime After Tank Refill command to prime the fluid lines if a 5 liter
plastic fluidics container was disconnected for refilling.
1 Turn off the stream.
2 Select Cytometer > Cleaning Modes > Prime After Tank Refill.
3 Select the checkboxes for the tanks that were refilled, then click OK.
The cytometer proceeds with priming the specified tanks. A progress
message appears while the tanks are being primed.
Seitenansicht 195
1 2 ... 191 192 193 194 195 196 197 198 199 200 201 ... 343 344

Kommentare zu diesen Handbüchern

Keine Kommentare