Aria 8.0 Betriebsanweisung Seite 209

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 344
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 208
Chapter 6: Shutdown and Maintenance 209
Flow Cell End
1 Turn the stream off (if needed).
2 Unscrew the connecting nut at the top of the flow cell and slowly pull out
the sample line. (See Figure 6-14.)
Figure 6-14 Secondary sample line insertion
3 Ensure that a cone-shaped ferrule is attached to the sample line.
If the ferrule was left behind in the flow cell fitting, gently push the tip of
the ferrule-removal tool (included in the accessory kit) into the top of the
ferrule and pull the ferrule straight out.
After using the tool, you might need to replace the ferrule. If the ferrule is
damaged, replace it with a spare (included in the accessory kit).
4 Slide the ferrule and nut off the end of the sample line.
5 Slide the nut and then the ferrule onto the end of the new sample tubing.
Leave approximately 0.1 inch (0.25 cm) of tubing extending out of the
ferrule. This length is referred to as the pilot, as shown in Figure 6-13 on
page 207.
nut
secondary sample line
ferrule
flow cell
Seitenansicht 208
1 2 ... 204 205 206 207 208 209 210 211 212 213 214 ... 343 344

Kommentare zu diesen Handbüchern

Keine Kommentare