Aria 8.0 Betriebsanweisung Seite 307

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 344
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 306
Appendix D: Temperature Control Option 307
Setting Up the ACDU Stage
This section describes how to attach the recirculating water tubing to the stage
used with the automated cell deposition unit (ACDU).
1 Install the splash shield below the aspirator drawer.
a Close the sort block door and open the sort collection chamber door, if
needed. (The sort block door must be closed in order to open the
collection chamber door.)
b Remove the tube holder, if one is installed.
c Insert the splash shield into the slotted fittings below the sort aspirator
drawer. Push the splash shield all the way in.
2 Click the Access Stage button to bring the ACDU stage to the front.
a Open an Experiment, if one is not already open, and create a sort
layout for any of the Tubes.
b In the Sort Layout view, click the Access Stage button ( ) to move
the stage to the front of the sort collection chamber.
3 Attach the recirculating water tubing to the ACDU stage.
Note that the tubing ports are labeled In and Out. Attach the input tubing
to the port on the left side of the stage, and the output tubing to the port on
the right side, as shown in Figure D-5 on page 308.
To a ttach the tub ing, pus h it into the port until the tubing sna ps into place.
Any instrument surface that comes in contact with biological specimens can
transmit potentially fatal disease. Use universal precautions when handling
sorting hardware. Wear suitable protective clothing and gloves.
Seitenansicht 306
1 2 ... 302 303 304 305 306 307 308 309 310 311 312 ... 343 344

Kommentare zu diesen Handbüchern

Keine Kommentare