Aria 8.0 Betriebsanweisung Seite 284

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 344
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 283
284 BD FACSAria II User’s Guide
Operating the BD Aerosol Management Option
Starting Up the Evacuator
NOTE Before starting up the evacuator, make sure that the ULPA filter is
completely seated against the bottom of the evacuator filter well, and that the
tubing is securely attached to the filter and instrument manifold.
1 Install the splash shield or the tube holder below the aspirator drawer
(Figure C-3 on page 285).
The splash shield is required for sorting into a multiwell plate or onto a
slide.
To i nstall the sp lash shield:
a Close the sort block door and open the sort collection chamber door, if
needed. (The sort block door must be closed in order to open the
collection chamber door.)
b Remove the tube holder, if one is installed.
c Insert the splash shield into the slotted fittings below the sort aspirator
drawer. (See Figure C-3 on page 285.) Push the splash shield all the
way in.
Any instrument surface that comes in contact with biological specimens can
transmit potentially fatal disease. Use universal precautions when handling
instrument hardware. Wear suitable protective clothing and gloves.
Seitenansicht 283
1 2 ... 279 280 281 282 283 284 285 286 287 288 289 ... 343 344

Kommentare zu diesen Handbüchern

Keine Kommentare